Éden Catalán

Events and news from the Catalan Coast

Natural sites Open season in progress

Barrage de Vinça

Vinça · Inland

© OTCC

About

The dam has two main functions: to store the water necessary for summer needs and to provide flood control. It is filled from April 1 to June 30 and emptied from July 1 to September 30. The concrete structure is 55 meters high and 192 meters long. Built in 1973, it replaced a hydroelectric plant.

Coming up in Vinça

Inland events →

Nearby

Source : Pyrénées-Orientales Tourisme (DATAtourisme, Open Licence 2.0) · updated 16 Oct 2026

← All natural sites